When remodeling a bathroom, it is essential to make a plan and focus on the wet area first. This will allow for a more professional finish and avoid awkward tile cuts around fixtures. It is also important to replaster and prepare the walls before adding any coverings. The process may include putting down the subfloor, hanging the drywall, and setting the wall tile underlayment in that order. If any concrete work is needed, it should be done before the drywall.
To make a plan, measure your bathroom, create a layout, and decide whether to tile the walls or floors first. Both options have pros and cons, but it is crucial to carefully consider the order of renovation. For a bathroom remodel, it is essential to finish each component in the proper order.
Installing the tub or flooring first is crucial for different types of bathtubs and flooring. For freestanding bathtubs or shower-only setups, it is recommended to install the flooring first. If you are doing the work yourself, allow more time for each step.
Choosing the right installer is as crucial as the remodeling steps themselves. Always remove the toilet and install the tiling first on your bathroom floor, as doing so can potentially mess them up while installing the fixtures. If you have a freestanding bathtub or a shower-only setup installed, ensure the flooring goes in first.
Flooring companies can do both ways, but removing the fixtures first and installing the new floor first ensures a proper and stable flooring surface. Laying down the floor first protects it from potential water damage during the shower installation. Once you have prepped your walls, you are ready to install the flooring in your home. Tiling the floors first means extra time for the project, as the mortar must dry before you resume working on the walls.
📹 What comes first? Flooring or Cabinets?
Flooring and Cabinets, which comes first? Weekly Bonus #11 Learn how to build your own home.
Do you lay flooring before fitting a bathroom?
The bathroom fitters generally recommend tiling the floor first for a high-quality finish and better water seal. This ensures tiles don’t need to be cut to awkward shapes and provides a layer of tile under the toilet to protect the floor from water. DJ Property Trades advises refitting toilets and washbasins after tile installation for three reasons: better seal, easier installation, and a more attractive finish.
Before installation, consider which type of toilet to choose based on your needs and preferences. It’s essential to prepare your floor before installation to ensure a high-quality finish and better water seal.
In what order should you renovate a bathroom?
The renovation plan for a bathroom includes demolition of current wall tiles and drywall, enclosing doors and windows, plasterboard wall and ceiling lining, electrical work, plumbing, tiling and waterproofing, shower screen, vanity cabinet, and removing the bath. The plan was inspired by a Bunnings video and includes removing the bath for a shower and installing a second toilet to maximize space.
What should be installed first in a bathroom?
Once the plumbing and sewer lines have been installed, the next stage is the installation of wall and floor tiles in the toilet and bathrooms. This is followed by the installation of vanity mirrors, lights, and exhaust.
Should vanity be installed before or after flooring?
Flooring contractors often prefer cabinets to be installed first to prevent floor scratches and to prevent damage to the vanity. Cabinet installers prefer the floor to be in place to prevent cutting and dust from the floor installation. If the bathroom floor is soft vinyl or easily scratched wood, cabinets should be installed first. Tile installation can raise abrasive dust, which can be removed using a powerful shop-vac or other means. However, if the vanity is not in the room yet, the dust won’t ruin it. The potential for damage depends on the type of floor being installed.
What do you install first in a bathroom remodel?
This blog post provides a guide on the sequence in bathroom remodels, focusing on the initial steps to prioritize during the renovation process. The first step is updating the plumbing, followed by installing the tub or shower base. The next step is finishing with acrylic or tile walls. The wet area, typically where the shower, tub, and major plumbing fixtures are located, should be the first focus.
This area is often the most labor-intensive part of a bathroom remodel and is prone to hidden problems such as water damage or outdated plumbing. By following this sequence, you can manage your budget effectively and minimize the risk of having to redo work.
When remodeling do you do floors first?
Before installing flooring in your home, it is crucial to prepare your walls and avoid repainting areas if damage occurs. This is especially important for hardwood floors, as dust or staining can mess up the new paintwork. Dust may be present after installation, but don’t waste time cleaning it up before painting. Once the flooring is in place, replace or reattach the trim around it to ensure the trim work fits the new flooring perfectly. Reattach the trim before painting to point over any screws. This will prevent dust and staining from messing up the new paintwork.
Should flooring be installed before or after built ins?
The decision to install cabinets or floors in your kitchen depends on the desired outcome. If you’re using floating floors, it’s generally better to install the floors first. This will allow appliances to sit at the appropriate height and provide a clearer picture of your kitchen space. Cabinets Direct USA, a trusted cabinet retailer in New Jersey and Florida, offers assistance in planning your kitchen and determining the best time to install cabinets. With showrooms in New Jersey and Boca Raton and Palm Beach Gardens, FL, it’s an ideal time to invest in your kitchen, bathroom, home-bar, or unique area for custom cabinets or countertops.
Do bathroom floors or cabinets go in first?
Installing cabinets first protects your bathroom’s flooring from damage and saves costs on installation. This is especially important for those on a budget, as it helps save the area under cabinets and prevents damage from heavy cabinets and equipment. However, leaving the area under cabinets un-floored may not be significant unless using premium materials like laminate, vinyl, or hardwood flooring.
In what order should you do a remodel?
The general order of operations for a whole home remodel is planning and design, demolition, rebuilding/framing, mechanicals/plumbing/HVAC/electrical, walls, flooring, cabinets, and appliances. This project is not for the faint of heart, as it is a once-in-a-lifetime experience for many homeowners. To help homeowners understand the process better, a general whole home renovation checklist has been developed. The checklist includes the general steps to follow, such as planning and designing, demolition, rebuilding/framing, mechanicals/plumbing/HVAC/electrical, walls, flooring, cabinets, and appliances.
The checklist should include items such as cabinets, appliances, walls, flooring, cabinets, and appliances. By following these steps, homeowners can better plan and organize their renovation, ensuring a successful and enjoyable experience.
Should you install flooring before or after cabinets?
Renovating your kitchen involves a complex process that includes determining the ideal layout, selecting new cabinets, choosing hardware and lighting, selecting countertops, and replacing appliances. The installation process should be done in a step-by-step manner, with flooring installed first. This is especially important for hardwood and tile flooring, as they raise the floor by a specific amount, which can affect the height of cabinets and appliances.
Installing flooring first allows for flexibility in future updates, as it runs under the cabinets and appliances, allowing for changes to the footprint. The general rule for kitchen remodels is to lay flooring, install cabinets, glue down countertops, and install backsplash, followed by adding appliances, sink, hardware, light fixtures, and backsplash. Some finishing steps can be moved around, depending on the subcontractor’s schedule.
In what order should I install my bathroom?
The bathroom is a frequently-used space that is often overlooked when considering home improvements. To remodel a bathroom, follow these seven steps: remove fixtures, install new shower or tub, lay new flooring, hang drywall and start painting, install cabinets and vanity, update lighting, and hook up the plumbing. Doing the do-it-yourself route can save up to a few thousand dollars, especially for gutting the bathroom. Other cost-saving tips include limiting the use of expensive materials like tile and refinishing fixtures instead of buying new.