The ideal slope for an exterior concrete slab is typically a one-quarter inch drop for every foot of length, which allows water to flow away from the slab and prevents pooling, which can lead to damage and safety hazards. This slope is crucial for preventing water damage and ensuring proper drainage for outdoor projects. A patio slope should drop 1/4 of an inch vertically for every horizontal foot. While steeper slopes are fine, a more gentle slope can cause pooling and even direct damage.
There are several main steps to pouring a concrete patio, including marking and excavating, assembling and leveling forms, mixing and pouring concrete, finishing the concrete, and more. A uniform concrete slab slope is best suited for shorter slabs such as garage floors or patios, while a variable slope may be required in longer concrete slabs to adapt to the terrain. Driveways, driveways, and patios should slope away from the house at the rate of 1/8″ (3mm) per running foot.
A patio should slope away from the house at the rate of 1/8″ (3mm) per running foot. Generally, a 4″ (100mm) thick slab set 2″ (50mm) above ground level is suitable. A recommended slope is 4″ for crushed stone, but it’s +/- 1″ in most places. If using a broom finish, roughen up the concrete surface with a broom finish or something.
The standard slope for proper concrete drainage is a one-quarter inch drop for every foot of length. A good rule is to use a minimum slope of 2, which is equivalent to a 1/4-inch drop for every foot of length. Calculating the patio fall is a case of dividing the fall by the run, typically using the industry standard ratio of 1:80. More than 1 is desirable for a patio, with a minimum of 1/8″ per ft. for smooth surfaces and a maximum of 5/8″.
📹 SLOPED LANDSCAPES (how to create usable space)
If you have a sloped landscape you could have the perfect Outdoor Living Space. This video will show you how.
What should the pitch be on a concrete patio?
In order to create a slope for a patio, it is recommended that the ratio of 1 inch for every 4 to 8 feet be considered. Alternatively, a steeper slope can be achieved by using a ratio of 5 inches. A five-inch stake should be marked away from the house, and the string should be moved to that mark in order to achieve the desired slope.
How much slope should a concrete patio have?
Concrete drainage requires a one-quarter inch drop for every foot of length, which can be calculated by multiplying the length by one-quarter. This means that a patio or walkway protruding 10-feet from a home will drop two and a half inches from the starting point. If a walkway does not naturally tilt away from a home, it should drop one inch away. If it runs perpendicular to a structure, it should follow the one-quarter inch pitch for every foot of length rule.
The standard measurement for concrete drainage is one-quarter inch drop per foot, but the slope can range from one-eighth to three-eighths per foot depending on the surrounding conditions and precipitation amount.
What is the best slope for a sidewalk?
Primary residential walkways should not slope more than 2 unless designed for wheelchair access, as it can be dangerous when covered in ice. Auxiliary walkways can have slopes up to 5, but if well-used, steps can be added. All walkways should have some slope for proper drainage. If a walkway drops more than 2. 4 inches over 10 feet, it is over 2 (drop x distance x 100). When the slope exceeds 2, use steps in the design, keeping them at a consistent height of 6-7 inches, as anything less than 4 inches is considered a trip hazard.
Is a 3% slope noticeable?
It is recommended that the maximum level of contact with the surface be limited to 2. 5, as even at this level, any issues resulting from the foot’s contact can be readily discerned. It is recommended that the design be tested using plywood mock-ups or a campus drainage plan, as even small slopes can be readily discerned by visual inspection.
What is the best pitch for a patio cover?
The pitch for a patio cover, or slope, is measured in inches per foot. Alumawood patio covers have a minimum slope of 1/4″ per foot, while Pergola Lattice covers have a maximum slope of 1″ per foot. The maximum slope ensures proper contact between roof panels, hanger, and beam. Pergola Lattice covers can be flat if desired, but have a maximum slope of 1″ per foot. To calculate the overall roof rise or fall, multiply the roof slope by the distance from the home to the beamline’s center.
What is the maximum slope for a concrete sidewalk?
The maximum grade of a sidewalk is five percent for up to two and a half feet of vertical change. If level landings are provided at two-and-a-half-foot intervals, the maximum grade may be increased to five to eight point three percent (5-8. 3).
What is the best gradient for patio?
To calculate patio fall, divide the fall by the run, typically using the industry standard ratio of 1:80. This means that the patio should fall 1 unit for every 80 units of distance. For example, if you have a 7-meter wide patio, the fall should be 1:80. To measure the fall per meter, divide the distance run by 80. This will give you the patio’s fall. For a step-by-step guide on how to lay a patio, refer to the provided resources.
How much slope for a covered patio?
The slope of a patio roof cover is crucial for its functionality and durability. A shallow pitch can trap water and cause drainage issues, while a minimum slope is 1/4 inch per 12 inches of run. The cover should match the home’s roof and prioritize aesthetic appeal to ensure the backyard design flows with the home. Proper slope allows rainwater and debris to effectively run off the roof, preventing leaks, damage, and costly repairs. A steeper slope prevents excessive snow buildup, which can cause structural stress and collapse in high-altitude regions.
The slope also affects the overall appearance of the patio, with some owners preferring a gentle slope for a more modern look, while others opt for a steeper pitch for a classic or rustic aesthetic. The slope should align with the owner’s design preferences and ensure the cover’s functionality and durability.
How much slope is too much for a patio?
TriStar Concrete Construction uses a pre-pour checklist to ensure proper planning and proper concrete slab slope. The slope should be enough to drain water in the right direction without being visible or felt, typically resulting in a quarter inch drop for every one foot or 2. Wrong elevations on one end can divert water back towards the house, causing foundation issues. Proper planning is crucial for successful concrete projects.
📹 DIY SELF LEVELING CONCRETE FLOORS!! $1 per square foot
You have to see this! How to get professional quality, finished concrete floors in your home using Self Leveling Concrete and this …
Your work is amazing. It’s the equivalent of having a master architect designing and building your dream home, as you literally make an outdoor living space. Unfortunately, an average homeowner like me would never be able to afford such an investment. How about some content that would show us how to achieve something similar but in a DIY format. A girl can dream…….
I’ve installed more than 1 million sq ft of Ardex K-15 self leveling underlayment in New York city rehab projects. Hat’s off to you for thinking of a new way to dispense the mix, although it has some bugs to work out. On big projects we used a concrete pump and gauge rakes set to 1/4 inch to guide the mix where it needs to go. We then went over it lightly with a long handled type of float to break the surface tension and allow it to flow better. Once it cures you are always going to get tiny hairline cracks that are actually mostly a cosmetic issue, and not a structural problem. It should be sealed with a clear water based matte urethane because it will continuously dust off and you will always have it on your feet if you don’t. These materials were designed to go under finished flooring, and not to be the actual floor.
Nice job guys! It looks great. I have a 70,000 sq foot 1927 five story office building. The floors are cement, but poured in small sections which are not level nor flat. Fine for carpet, but we wanted to change to wood (laminate planks). I am just a DIY, not a contractor, but I have done a LOT of these pours (200 to 2000 feet). The first step is we grind down the high spots at the corners and edges of each original pour. Then I like to use this self leveling stuff. It is SIX TIMES the cost of regular cement, but it flows like thick soup. It does NOT in fact self level all that well. Especially if you do it like these guys did, in large pours. The thing is, it sets in a flat amount of TIME, not by drying out (it is a chemical reaction), and that time is just a few minutes. You do not really have time to fuss with it, and if your next bucket is not ready pretty quick, the earlier pour will set before your next pour, and it will not be homogenous (you will end up with dry seams instead of a continuous pour). So, there are a couple of tools we use. One is the beveled cement float (like a push broom for shoving around cement)(A gage rake probably works too). This is used right after you pour a bucket to get it into the corners and edges quickly (time is of the essence). The second tool is the spiked roller (think pinhead on a 18 inch wide paint roller). This is used to QUICKLY smooth it all out and blend the different pours and pop any bubbles (careful not to push it too fast or it will spray cement all over your walls and pants), and do not overdo it, once the cement starts to set, it is game over.
That slurry will form fine cracks overtime, despite having been protected with a sealer. It might not do anything to the floor structurally considering it’s a single storey house but it will be visible. Now, if you want to prevent that, lay down a layer of fine mesh (preferably a fibre mesh instead of a metal one as the latter would expand when the concrete sets, creating uneven waves) before pouring in the self-leveler slurry. The mesh will provide tensile strength, preventing any cracks from forming on the floor…
This isn’t what this product is designed for, there are cold joins everywhere which will fracture and crack and there are no expansion joins anywhere. He should really do a update article in a year to see if it has cracked through the doorways, cold joins and see what damage the floor has received from general use
I dont understand all the hate. For a two person job I really don’t see the suggested comments where they say it should just be “directly poured on floor” working out. Too many seams with walking back and forth and opening bags etc. I think this was an excellent way to build a tool that saved your back, your time, and a lot of headaches running around trying to prevent a seam from each bag. Great job
Cool effect. I definitely like it. Use a decoupling membrane and go into this with the understanding that it will crack. Either treat the cracks as a “design opportunity” or just leave them as character. If you’re doing this over a slab you definitely need a decoupling membrane because the existing slab will pull the water out of the skim coat too fast and ruin the whole job. Once again, a decoupling membrane would mitigate this issue as well. They are like little waffles so they give the pour something to grip, which helps prevent cracking too. You could hose down the slab but who wants to do that in an existing house.
This works great as a floor underlayment, but it is going to crack. Cementitious products will lose moisture over the next few weeks and continue to harden and shrink and creep. It’s just the properties of products themselves. This is why sidewalks have joints in them and why slab on grades have saw cuts typically 20-25 feet on center to allow cracks to form along that joint. Over the next few weeks you’ll likely see spider cracking. It doesn’t mean that it is falling apart, Mike may make it a feature. Hopefully it doesn’t delaminate and start popping off, but the bonding agent that Mike laid down should help with that. Like I said, it’s primary application is an underlayment for floor so you don’t care if it cracks because a wood floor or tile is the main surface. I’d love to see a 1 year follow up on this floor and especially the countertops since I have less faith in those holding up over time. I can consider myself an expert with knowing concrete, I am a structural engineer so I know a whole lot about concrete. I also sometimes get asked questions about cementitious products like this to help architects spec floor underlayments that will work with their finishes.
This is excellent. I’ve donethis to a floor with 5 gallon buckets and it was extremely tedious. This set-up is fantastic. I made the mistake of letting part of it dry too much before the next pour, like he did. Really imperative to have the next batch ready to go. Definitely best to have someone mixing while you pour.
Interesting. I’ve never seen an overlay product last very long without heavy prep done prior to installation. Im sure with the minimal foot traffic you can get decent life out of this though. Im interested in seeing a follow up article. Also, look at penetrating sealers if you are looking for something that isn’t slippery. My floor is polished up to an 85 DOI and I can’t slide on it.
I just called the company that makes this stuff & they said it is only to be used as an underlayment & not for an exposed concrete floor. They said because of pressure points it will crack. I also called a concrete specialist about doing this & he said you need at least 3″ of concrete to get to the necessary PSI. 1/4″ or co will crack & possibly shatter like glass. I’ll be curious to see how yours holds up over time.
The house I bought had 44′ of drain line replace as a condition of purchase and the previous owners didn’t level the floor in the kitchen and hallway when sections of the slab repoured. They then threw ceramic tiles down which began cracking right away. Temporarily used about 30 tubes of Fix a Floor and at least the tiles hold in place. Eventually all must come up; the slab underneath probably looks like the moon.
Its not flat its bumpy and uneven and cracked in 1-2 weeks (if not days). Thats the most wrong way to do self leveling concrete ) just because its says “Self leveling” in fact its not ) you did many mistakes: 1) no damping tape at perimeter – floor will crack 2) no spiked roller – there will be bubbles in it and will make it less durable and less waterproof 3) you didn’t use smoother – floor surface will be uneven 4) you didn’t use leveling pins to make it ideally flat, leveled and even 5) in order to do 2-3 steps you needed nail shoes ))) 6) its better to use small portions at the time instead of 25 gal at once, since its dries very fast and you wont have time to complete all steps correctly, its better do by zones partially, especially if you are new to this You dont have to be pro constructor to accomplish it, just do it right as manufacturers suggest
This is the most useless contraption known to man. I do this for a living. Mix 2 bags at a time and dump it on the floor as quickly as possible so you have an even poor. You want everything drying about the same time. It’s self leveling so it’s not necessary to wheel a contraption around to get an even coating. Waste of time. Dump it, rake it, and have someone else getting the next mix going in the meantime.